datalicense

All datasets / electricsheepafrica

electricsheepafrica/africa-cote-d-ivoire-planification-de-l-electrification-rurale-proner-entre-201-f7849228

5 downloads in 30 days0 likesLast modified 11 Aug 2026View on Hugging Face
Unclear

The checks could not identify a recognised licence ID in the dataset's metadata.

Declared licence
other, from the tagEvidence: README.md at 76d4bd6
Licence files
No licence file at the top level of the repositoryEvidence: file list at 76d4bd6
Declared sources
None listed in the card metadata
Access gated on Hugging Face
No
electricsheepafrica/africa-cote-d-ivoire-planification-de-l-electrification-rurale-proner-entre-201-f7849228electricsheepafrica…other: declared licenceotherdeclared licenceREADME.md ↗no licence file: found at top levelno licence fi…found at top levelfile list ↗
electricsheepafrica/africa-cote-d-ivoire-planification-de-l-electrification-rurale-proner-entre-201-f7849228electricsheepaf…other: declared licenceotherdeclared licenceREADME.md ↗no licence file: found at top levelno licence fi…found at top levelfile list ↗
Each cell links to what was checked: a file, a file list or a Hub record.

Tasks

Citation text from the card

@misc{electric_sheep_africa_africa_cote_d_ivoire_planification_de_l_electrification_rurale_proner_entre_201_2025,
  title        = {Planification De L Electrification Rurale Proner Entre 201 | Africa (Cote d'Ivoire DataFair)},
  author       = {Ministère des Mines, du Pétrole et de l'Énergie},
  year         = {2025},
  url          = {https://data.gouv.ci/datasets/planification-electrification-rurale-proner},
  publisher    = {Hugging Face Datasets, engineered by Electric Sheep Africa},
  howpublished = {\url{https://huggingface.co/datasets/electricsheepafrica/africa-cote-d-ivoire-planification-de-l-electrification-rurale-proner-entre-201-f7849228}}
}

The same facts for your agent

A free MCP server at mcp.datalicense.uk/mcp. Connect it from an MCP client such as Claude or Cursor.

dataset_licence({ "id": "electricsheepafrica/africa-cote-d-ivoire-planification-de-l-electrification-rurale-proner-entre-201-f7849228" })
signal: "unclear"
stated_licence: "other"
sources: 0